[December 18, 2008]: [1.5 Hours] Plumbed and installed brake pedals [December 19, 2008]: [2 Hours] Trimmed subpanel for vent interference, magetometer tray [December 21, 2008]: [9.5 Hours] Installed tubing for electric fuel pump and filter; finished fuel line routing [February 12, 2009]: [3 Hours] Started mounting the EFIS magnetomer support tray [February 28, 2009]: [1.5 Hours] Mounted manifold pressure transducer; riveted magnetomer tray [March 2, 2009]: [2 Hours] Mounted magnetometer [August 18, 2009]: [2 Hours] Fixed interference with flap actuator channel [September 1, 2009]: [1 Hour] Painted floors misc stuff [September 3, 2009]: [2 Hours] Installed Floors [September 4, 2009]: [2.5 Hours] Installed flap position sensor [September 5, 2009]: [3 Hours] Stick grips / Flap motor wiring [September 7, 2009]: [6 Hours] Painted bottom cowl, stick wiring, engine ground [October 27, 2009]: [2 Hours] Bled the brakes [November 13, 2009]: [3 Hours] Installing stuff in panel; pitot/static plumbing [November 14, 2009]: [5 Hours] Power Point wired; sealed avionics tray; etc.. [November 15, 2009]: [4 Hours] Installed avionics, ELT wiring, painted map box [November 16, 2009]: [1 Hour] Attempted to put passenger warning label on [November 19, 2009]: [2 Hours] Installed map box and panel blanks [November 20, 2009]: [1 Hour] Started annunicator lights [November 22, 2009]: [3.5 Hours] Wired up annunicators, wrapping wires [November 23, 2009]: [2.5 Hours] Tying off wires ; took off canopy [November 29, 2009]: [3 Hours] Covered wires going up firewall, installed ELT. Installed controls [November 30, 2009]: [3 Hours] Routed control cables, work on canopy fairing [December 1, 2009]: [1.5 Hours] Canopy fairing [December 2, 2009]: [4.5 Hours] Canopy fairing heater FAB other stuff [December 3, 2009]: [0.5 Hours] Canopy fairing [December 9, 2009]: [2.5 Hours] Canopy fairing, control cable passthrough [December 10, 2009]: [0.5 Hours] Canopy Fairing [December 11, 2009]: [2 Hours] Finished main canopy fairing; pinhole filing [December 13, 2009]: [4 Hours] More canopy fairing, blast tube, rear window [December 14, 2009]: [1.5 Hours] test fit canopy [December 18, 2009]: [2 Hours] Canopy prep [December 19, 2009]: [6 Hours] Primed canopy fairing, painted rollbar [December 21, 2009]: [1.5 Hours] More painting and priming [December 22, 2009]: [0.75 Hours] Canopy and rollbar work [December 24, 2009]: [1 Hour] Riveted Canopy Frame [December 25, 2009]: [2 Hours] Finished installing rollbar [December 26, 2009]: [2 Hours] Started empennage fairing [December 27, 2009]: [4.5 Hours] Fiberglass work on empennage fairing painted stuff [December 28, 2009]: [4 Hours] Emp. fairing elevator trim servo [January 3, 2010]: [3.5 Hours] Worked on emp. fairing [January 4, 2010]: [2.5 Hours] Started installing rear window fairing work [January 5, 2010]: [3 Hours] Finished rear window, emp. fairing, misc stuff [January 6, 2010]: [3 Hours] Wired elevator trim tail light wiring more fairing work [January 7, 2010]: [3 Hours] Rigged elevator pushrods [January 9, 2010]: [0.5 Hours] Connected elevator pushrods [January 11, 2010]: [2.5 Hours] Back to work on the empennage fairings [January 12, 2010]: [0.5 Hours] More filling of aft end of empennage fairing [January 13, 2010]: [0.5 Hours] More fairing glassin' [January 15, 2010]: [2 Hours] Mounted left wing temporarily [January 16, 2010]: [2.5 Hours] Ran pitot line in wing drilled pitot tube to mount [January 19, 2010]: [2.5 Hours] Worked on wingtip landing lights [January 20, 2010]: [2 Hours] landing/taxi lights [January 22, 2010]: [4 Hours] Wingtip lights [January 23, 2010]: [8 Hours] Wingtips landing lights emp fairing tail light [January 24, 2010]: [1 Hour] Finished taillight mounting bracket primed emp fairing [January 25, 2010]: [4 Hours] Wingtip hinges Nav Antenna Mounted Emp Fairing [January 26, 2010]: [1.5 Hours] emp fairing misc [January 28, 2010]: [2 Hours] Rudder bottom fairing [January 30, 2010]: [1.5 Hours] Moved the wings to the airport + rudder tips + emp fairing [January 31, 2010]: [4 Hours] Finished empennage fairing installed bottom rudder tip [February 2, 2010]: [2 Hours] started top tips of rudder and vertical stablizer [February 5, 2010]: [5 Hours] Empennage Tips [February 8, 2010]: [2 Hours] Test Fit Seats, emp tips [February 10, 2010]: [3 Hours] Started fiberglassing rudder tips [February 11, 2010]: [3.5 Hours] Made seal for plenum rudder tips [February 15, 2010]: [4 Hours] Plenum Seal glassing empennage [February 16, 2010]: [1 Hour] Sanding and filling rudder tips [March 20, 2010]: [7 Hours] Fuselage move prep [March 21, 2010]: [5 Hours] Moved project to the hangar! [March 28, 2010]: [6 Hours] Installed left wing pitot installed [March 31, 2010]: [3 Hours] Rigged left aileron; pitot heat connected [April 2, 2010]: [4 Hours] Mounted right wing and propeller [April 3, 2010]: [2 Hours] Wired some of the right wing, rigged ailerons [April 7, 2010]: [2 Hours] Fuel sensor wire routing OAT sensor wired [April 13, 2010]: [1 Hour] Empennage Tips [April 16, 2010]: [3 Hours] More empennage tip filler work [April 17, 2010]: [1.5 Hours] Emp filling [April 18, 2010]: [3 Hours] More emp filling [April 21, 2010]: [2.5 Hours] Filled right elevator [April 25, 2010]: [4.5 Hours] Primed horizontal stab tips [April 26, 2010]: [2.5 Hours] Primed elevator tips [May 11, 2010]: [2 Hours] Filling rudder/vertical stabilizer tips [May 12, 2010]: [3.5 Hours] Hangar Organization Finished empennage tips! [May 14, 2010]: [2.5 Hours] Installed Empennage [May 15, 2010]: [2 Hours] Wired tail nav and strobe light [May 24, 2010]: [0.5 Hours] Fiberglassed NAV antenna to wingtip [May 25, 2010]: [2 Hours] Rudder pedal linkage torqued prop bolts [May 27, 2010]: [6 Hours] Prop Bolts - Alternator - Trim Tab - Lights [May 28, 2010]: [1 Hour] Painted rudder linkages and topcoated flap cover and seat backs [May 29, 2010]: [11 Hours] Too much little stuff to list! [May 30, 2010]: [4 Hours] Wingtip lights and trimming [June 1, 2010]: [5 Hours] Aft wingtip modification [June 2, 2010]: [1.5 Hours] Started on exterior cowl surface prep [June 5, 2010]: [7 Hours] Tech inspection, started to mount spinner, worked on "the list" [June 7, 2010]: [2 Hours] Top Cowl Exterior Finishing [July 9, 2010]: [4 Hours] Top Cowl Prep [July 13, 2010]: [2 Hours] Pinhole filling [July 16, 2010]: [2.5 Hours] Top Cowl Finishing [July 17, 2010]: [2 Hours] Top coated the top cowl [July 19, 2010]: [5 Hours] Bottom cowl work [July 20, 2010]: [4.5 Hours] Bottom cowl primed parts [July 21, 2010]: [4.5 Hours] Day at the hangar [July 28, 2010]: [2 Hours] Made a pre-oiler [July 30, 2010]: [5 Hours] pre-oiled engine [July 31, 2010]: [2 Hours] Fixed prop control bolt and removed emag wiring [August 1, 2010]: [8 Hours] Readied the engine for first start. [August 2, 2010]: [5 Hours] Wingtips and FIRST ENGINE START! [August 4, 2010]: [3 Hours] Right wingtip work [August 8, 2010]: [5 Hours] primed fwd skin, wingtips misc [August 9, 2010]: [4 Hours] Riveted on forward skin. Installed Canopy. [August 10, 2010]: [5 Hours] Installed Vents, Secured Fuel level wire, left wingtip lights [August 11, 2010]: [4 Hours] Wingtip antennas wired, lower cowl fitted [August 12, 2010]: [4 Hours] Worked on air intake neoprene adapters to plenum [August 16, 2010]: [4 Hours] Upper Cowl, Canopy Latch, other misc stuff [August 18, 2010]: [1.5 Hours] First Taxi Test! [August 19, 2010]: [3 Hours] Pitot-Static-Transponder Check [August 25, 2010]: [3 Hours] Finished painting interior panels [August 27, 2010]: [5 Hours] Tracked Prop and ELT antenna [August 28, 2010]: [5 Hours] Installed Interior [August 29, 2010]: [8 Hours] Weight and Balance, preparing for final FAA inspection [August 30, 2010]: [3 Hours] AIRWORTHY! [September 1, 2010]: [2 Hours] Started to put the airplane back together [September 2, 2010]: [2 Hours] Installed wing root fairings |
|
|
http://RVplane.com |
Last Modified: September 2, 2010 |