[<<Prev]
[Next>>]
[June 8, 2009]


I wanted the EGT and CHT probe completed tonight. All I needed to do was route the wires and zip-tie them to the spark plug wires.


And the right side. It fees awesome to have this behind me. These wires have been hanging pointlessly for months!


One last item to tackle on the baffles are the two long stainless steel rods that need to be threaded to hold the bottom part of the baffles together.


I was only able to do the right side tonight. The outboard support needed some included tubing put onto it to avoid any rubbing on the oil return line.

[<<Prev]
[Next>>]

http://RVplane.com

Last Modified: August 13, 2023